• High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010
  • High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010
  • High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010
  • High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010
  • High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010
  • High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010

High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010

After-sales Service: Online
Warranty: 1 Year
Inner Volume: 42L
Transport Package: Plywood Case
Specification: 1550*1650*1470mm
Trademark: GONOAVA
Samples:
US$ 1000/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2024

Suppliers with verified business licenses

Hunan, China
Importers and Exporters
The supplier has import and export rights
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 15 days
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (6)

Basic Info.

Model NO.
GA-2010
Origin
China
HS Code
9024800000
Production Capacity
200

Product Description

High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010High And Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber GA-2010
Use
Programable thermal shock chamber price is used to test the change of material under extremely high temperature and extremely low temperature environment that continue alternation in the shortest time,Testing the chemical changes or physical damage of material caused by the thermal expansion and contraction. Testing box divided two parts, one is hightemperature region, another is low-temperatureregion, the testing sample placed on the moving basket, using unique heat storage and cool storage,the cylinder taking basket moves up and down in the hot and cold region to complete the hot and cold temperature impact testing.

Specification
Model A
(A~D)
B
(A~D)
C
(A~D)
D
(A~D)
E
(A~D)
F
(A~D)
Inner size: WHD(cm) 40*35*30 50*30*40 50*40*40 50*50*40 60*40*50 60*50*50
External size: WHD(cm) 150*180*150 160*175*160 160*185*160 160*185*170 170*185*170 170*195*170
Temperature range(Test Chamber) high temperature:+60ºC~+200ºC;low temperature -10ºC~-65ºC(A:-45ºC;B:-55ºC;C:-65ºC)
Heating Time RT~200ºC About 30min
Cooling Time RT~-70ºC About 85min
Temperature Conversion Time Less than 10S
Temperature Recovery Time Less than 5min
Temperature Deviation ±2.0ºC
Temperature Fluctuation ±0.5ºC
Material External material: SUS#304 Stainless steel plate
Internal material:SUS#304Stainless steel plate
Output Mode Water-cooled or air-cooled,Taikang compressor in France
Controller TEMI South Korea
Cooling System Water-cooled or air-cooled,Taikang compressor in France
Protection devices Fuse switch, compressor overload switch, refrigerant high and low pressure
protection switch,super humidity over-temperature protection switch,
fuse, failure warning system
patrs Watching window;50mm testing hole; partition plat
Power AC380V 50/60Hz  Three-phase four-wire ac power
weight (kg) 750 790 830 880 950 1050


High And Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber GA-2010 
1.Profile.
1.1 Item Thermal shock test chamber (three zone)
1.2Model GA-2010
1.3Sample restrictions

 
The equipment is prohibited to do the test and storing as below:
  • Flammable, explosive, volastile substances;
  • Corrosive substances;
  • Biological samples;
  • Source of strong electromagnetic radiation.
1.4 Test condition Envrionmental temperature: +25ºC; humidity: ≤85%, with no samples inside the chamber
1.5 Test method GB/T 5170.2-1996 temperature test chamber and so on
1.6 Meet the test standard Meet GB2423, IEC68-2-14, JIS C 0025, MIL-STD-883E,
IPC 2.6.7, BELLCORE and other standards
2.Technical parameters.
Inner size (WxHxD)mm 400×350×300mm  
Inner volume 42L
External size (WxHxD)mm 1550x1650x 1470mm
Preheating temperature +60ºC~+200ºC (heat up +25ºC~+200ºC/ 20min)
Precooling temperature -10ºC ~-45ºC (cooling +25ºC~-45 ºC/65min)
High temp. shock range +60ºC~+150ºC
Low temp. shock range -10ºC~-40ºC
Temperature fluctuation ±0.5ºC
Temperature deviation ±2.0ºC
Shock recovery time 5min (control point)
3. Structure
3-1. Inner & External chamber material Inner / External chamber: stainless steel plate (SUS # 304)
3-2. Main structure design   Divided into low temperature storing area, product testing area, high temperature heat storing area.
3-3. Cooling storage / heating storage material High efficiency aluminum enable heat storage capacity and super-cold capacity to reach super fast exchanging.
3-4.Environmental conditions Meet MIL , IEC , JIS ,IPC etc. and the specifications of the chamber
3-6. Testing hole For connecting external testing wire and signal (10.0cm) of 1 piece
3-7. Table running wheel Moving position adjustbale and forced fixed knot position (500kg/wheel)
3-8. Thermal insulating layer Burning fire resistant thermal insulation layer PU + thermal insulation wool (thermal insulation thickness of 12.0 cm)
3-9. Frame inside chamber Height adjustable grid shelves and stainless steel mesh grid plate (2pcs, separation distance of 5.0cm )
4.Supply air circulation system
4-1.Electric heating circulatory system utilize circulatory motor of special moisture-proof, with stainless steel extension axis.
4-2. Circulating fan High/low temperature resistance aluminum alloy multi-wing centrifugal wind wheel.
4-3. High evenness air flue Positive pressure outlet design to achieve high uniformity requirements.
4-4. Temp. electric heating control Balanced temp. P.I.D + P.W.M + S.S.R system.
4-5. Microcomputer control Microcomputer control, pre-cooling zone, preheating zone and temperature conversion in the test zone, output power which is calculated by computer to achieve high accuracy and high efficiency electricity.
5.Refrigeration system
5-1. Refrigeration device High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010
5-2. Hot and cold switching device Taiwan (Kaori) ultra-efficient 316# stainless steel plate cold & heat refrigerant exchanging design.
5-3. Heating load regulation Adjust the flow of refrigerant by microcomputer automatically which takes heat load effectively for the samples waiting to be tested; compared to the traditional design, it improves control stability and reproducibility, also achieves power saving to get super efficiency.
5-4. Condenser High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010 
5-5.Effeciency super freezing control refrigerant Refrigerant pipes are welded with pressurized nitrogen and passed leak test.
5-6. Evaporator Slope evaporator with high efficiency component (AC & R double spoiler aluminum fins).
5-7. Standard modular Compatibility and interoperability of components of high quality and stability.
5-8.Expansion of performance The control system can  reserve isothermal control Liquid nitrogen valve LN2V and refrigerant valve FV control interface.
6.Control system
6-1 Controller
A.Temperature sensor T-type rapid induction sensor.
B.Temperature converter Automatic correction of linear compensation temperature converter by microcomputer
C.Display panel High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010
D.Control mode Touch control screen (100,000 times of line drawing test)
 
E.Storing device USB2.0 Interface & R-232C bidirectional control and computer hard drives data store.
The controller with 60 seconds for sample calculation which can record historical data and curve within 60 days.
High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010
            Test curve download                                               Test data download


 
F.Humanized operation interface A.I. + Fuzzy control interface functions.
a. Auto-control Refrigeration compressors with refrigerant automatic servo control, temperature electric heating, PID, PWM, SSR and so on.
b. Safety device Detecting faults of all parts and alarm shutdown function
G.Expansion interface and control apparatus (the following function is optional and should be paid, details refer to the contract)
a. PCOperation system Record storage, curve, historical data  through the RS232 interface and can be analyzed / Print / E-mail / hard disk storage.
b.Liquid nitrogen interface Liquid nitrogen ( LN2 ) control interface device .
c. Programmable
control interface  
Relay 220V 3A * 2 group, programmable logic external drive assembly output. (ON / OFF)
(Signal, institutions, power-related auxiliary control etc.)
d. Internet remote monitoring interface             High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010
High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010
Working condition can be remotely monitored and operated via the internet.
6-2. Main function of the controller
A.Temperature analytical ability 0.1 ºC
B.Temperature control precision ±0.2 ºC
C. Time range set 0 H 1 M ~ 9999 H 59 M
D. Memory capacity 96 PROGRAM×3200 CYCLE
a. FUNCTION 1
 
Positive and negative temperature shock
  Low temp. shock       High temp. shock
b. FUNCTION 2 Run high-temperature storage independently
c. FUNCTION 3 Run low-temperature storage independently
d.Power-saving operation mode (1) Microcomputer controls refrigerant flow rate with intelligent servo to save power.
e.Power-saving operation mode (2) When high-temperature set period is longer than two hours, compressor shutdown for waiting;
When low-temperature set period is longer than two hours, high temperature tank shutdown for waiting;
E. Display language Chinese(S) / English (colorful TFT operation / fault cause / troubleshooting)
F. Set-up time reservation Set-up time seting function
G. Calculation control Execute temperature shock program changing control and connection control program automatically
H. Page display Full-color real-time curve display (set curve and actual value curve).
High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010
I.Fault record device software Machine maintenance real-time control storage/record/ analysis / e-mail
J.Controller deviation setting Intelligent digital temperature deviation "zero."
K. Choice after recovery from outage Choose "continue", "again", "stop" after outage or recovery.
L.Program complete choice After the process completed, select the settings of "cold storage", "high-temperature storage", "linked to another group" .
M. Optional skip  function It can jump to the next segment during program running
N.Control calculation software Adjust the flow of refrigerant by microcomputer automatically which takes heat load effectively for the samples waiting to be tested; compared to the traditional design, it improves control stability and reproducibility, also achieves power saving to get super efficiency.
O.High and low temperature protection upper limit high and low temperature protection limit can be set during test procedures.
P. Auto-impact/defrost Suspend defrost and impact manually during automatic operation
Q. Protection device The controller monitors security systems and preventive fault detecting control interface automatically
R.Power-cut memory device Ensure the program memory data stored during power outage
S. Fool-proof design within the capacity range Display control capabilities of machine, with the display of fool-proof design that exceeds the ability range.
T.Security permissions settings Machine operation password permissions.
U. With screen protector screen protector
7.Safety protection device
7-1.Leakage / surge prevention protection LG leakage circuit breaker protection FUSE.RC electronic surge protected.
7-2. Over load protection device AC Power source Three-phase power supply due to lack or inverse phase and overcurrent protection (overload)
7-3.Auto-detection protection device equipped inside the controller A. Microcomputer data transmission detection DATA CHEAK SUM
B. Temp. sensor-(Sensor) Open or short circuit (+ - OVER)
C. Controller internal temperature limit for the first layer of high temperature, low temperature and over-temperature protection settings.
7-4. Fault detecting control interface  
External fault auto-detection and protection device
A. Panel high temperature and over-temperature protection setting, the second layer with high temperature over-temperature electronic protection device
B. Hot groove/cold groove/anti-dry protection, the third layer with high temperature over-temperature protection.
C. Compressor protection - refrigerant pressure protection and overload protection device.
D. Compressor protection - overheating protection and device.
E. Pressure protection device - pneumatic drive mechanism pneumatic pressure source protection and cooling water pressure protection device.
7-5. Fault protection
Turn off the power due to malfunction and output alarm signal
8.Professional production technology
8-1. All components modularization or standardized manufacturing.
8-2. Nitrogen refrigeration system welding, precision instruments nitrogen pressurization test.
8-3. Japanese vacuum pump and American precision digital instrument to do vacuum test.
8-4. Microcomputer controller: temperature inspection instrument
8-5. Temperature electric heating controls electric power test and insulation resistance test (above 50 M Ohm / 500 DCV)
8-6. Each machine before leave factory need a burn-in test up to 7 days.
9.Precautions (The buyer will be responsible for configuring the chamber next to the machine)
9-1. MAX 380V/50Hz, 3Φ, 5 Wire, 85A. (Voltage range less than ±10%)
9-2. Air pressure source - 1/2 HP compressor available around 10m distance, with pressure not less than 5Kg / CM2.
 
High And Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber GA-2010
10.Core parts.
No. Parts Origin/brand No. Parts Origin/brand
1 Controller Taiwan/ Delta 12 Temp. sensor Japan/DIN
2 Compressor Germany/GEA 13 evaporator Japan/Shuangling
3 condenser Japan /Shuangling 14 S.S.R TW/CKC
4 Condenser draught fan Germany/Mahr 15 Internal & external chamber material Japan/Denshi
5 Expansion valve Denmark 16 Wind cylinder TW/Sunrise
6 Solenoid valve Denmark 17 Wind wheel TW/Guangshuo
8 Plate-type heating converter TW/Kaori 18 Heating tube TW/TAIE
9 Cycle motor TW/MOTOR 19 Thermo relay Korea /LG
10 Oil separator USA/AICO 20 Solid-state relay Korea /LG
11 Overtemperature protection device Japan 21 Main switch Japan/ MITSUBISHI
Remark: Some small parts, such as due to material out of stock, it's possible to use other parts instead of the similar brand.
High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010High and Low Temperature Impact Testing Machine Tester Equipment Two Box Cold Heat Shock Test Chamber Ga-2010

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now